How much is the decoration budget of three bedroom

2022-07-22
  • Detail

Project 1: Foundation Engineering

wall peeling (gypsum plaster) 1080.00

wall blank base course treatment 540.00

wall/ground cement mortar leveling 1400.00

door pocket base course (Blockboard) 210.00

demolition of brick wall (240 mm) 750.00

demolition of original doors and windows and covers 110.00

light brick wall (120 mm double-sided plastering) 1575.00

after wall removal Painting of beam bottom and other parts 360.00

removal of bay window 240.00

powder supplement after removal of bay window 100.00

foundation repair after removal of original wall 800.00

removal of thermal insulation wall 420.00

repair after removal of thermal insulation wall 525.00

Project II: Waterway and circuit engineering

strong and weak current construction (lump sum price) 7520.00

waterway construction (lump sum price) 1800.00

strong Installation of weak current box 100.00

change down pipe 148.00

change down pipe 283.50

balcony water outlet 300.00

Project III: guest restaurant and aisle

latex paint base treatment (putty) 1800.00

latex paint 720.00

gypsum board linear light trough ceiling 2200.00

shoe cabinet (including door and ecological board) 2700.00

gypsum board 100 is sealed on the upper part of the cabinet..00

general specification of floor tiles (500 × 500< Size ≤ 800 × 800) 1625.00

TV background wall 1000.00

item 4: master bedroom

emulsion paint base treatment (putty) 1100.00

emulsion paint 440.00

wardrobe cabinet body (ecological board) 2592.00

wardrobe door (ecological board) 198.00

gypsum board sealing on the upper part of the cabinet body 100.00

ground leveling 390.00

item 5: secondary bedroom

emulsion paint base treatment (putty) 940.00

emulsion paint 376.00

wardrobe cabinet body (ecological board) 3892.20

wardrobe door (ecological board) 280.50

gypsum board sealing on the upper part of the cabinet 145.00

ground leveling 300.00

secondary bedroom 2

emulsion paint base treatment (putty) 680.00

emulsion paint 272.00

wardrobe cabinet body (ecological board) 1680.00

wardrobe door (ecological board) 577.50

tatami cabinet 1170.00

tatami drawer 200.00

computer desk 600.00

floor leveling 300.00

item 6: Kitchen

wall tile general specification (300 × 450 < size ≤ 300 × 600) 1265.00

general specification of floor tiles (size 300 × 300) 385.00

kitchen waterproof treatment 450.00

kitchen and sanitary package pipes 156.00

doorway stone paving 25.00

item 7: bathroom

wall tile general specification (300 × 450 < size ≤ 300 × 600) 1375.00

general specification of floor tiles (size 300 × 300) 275.00

toilet backfilling and surface leveling 600.00

toilet waterproof treatment 900.00

kitchen and sanitary package pipes 455.00

lintel paving 50.00

toilet downpipe protection works 200.00

kitchen and toilet riser protection 150.00

item 8: balcony

latex paint base treatment (putty) 60.00

latex paint 24.00

paving general specification of floor tiles (200 × 200 < size ≤ 800 × 800) 165.00

common specification of wall tiles (300 × 450 < size ≤ 300 × 600) 840.00

balcony railing base tiling 105.00

storage cabinet (ecological board) 399.20

storage cabinet door (ecological board) 82.50

balcony waterproof treatment 225.00

balcony expansion 800.00

Item 9: miscellaneous

materials upstairs fee 300.00

materials transportation fee 300.00

indoor garbage removal fee 300.00

lamp installation 200.00

sanitary ware installation 150.00

hardware installation 100.00

finished product protection 300.00

ground fixation 300.00

item 10: other charges

third party supervision 1299.00

the above is compiled by Xiaobian for everyone Wuhan 94 square meters half package decoration quotation and schedule, you also need to know other decoration knowledge or decoration information, you can enter Wuhan home decoration network to get more. If you have a house that needs to be decorated, you can enter the decoration bidding page of Wuhan home decoration network to provide you with free door-to-door room measurement service, formulate a plan quotation, and have a reduction or exemption of some decoration funds. See the activity page for details http://whjzw.net/zb/。